Integrated Bioenergy Center Development

Engineering Studies
Black & Veatch Corporation has been hired to complete several tasks including a review of the Center model, a study of water efficiency and use, and a study of the integration among the Center’s subsystems. Black & Veatch is a leading developer of coal-based power plants and brings a wealth of engineering expertise to the project.

Because of the timing of the subsystem construction, some will come on-line without being fully integrated with other participants. Black & Veatch expertise will assist participants with integration, as they are able to utilize waste streams and other inputs.

Construction Schedule
Construction will begin at the site when each subsystem contract is complete. Site engineering is underway in preparation for the necessary roads and electrical infrastructure needed to serve the project.

The Center developers and the Holcomb Expansion Project participants are also working with the city of Holcomb and Finney County to plan for area traffic impacts resulting from the Center’s development activities. Current project estimates reflect an expected capital investment of $417 million, which will result in the creation of 161 full-time jobs after construction.